A program manager recognizes that a successful resource being used in project A could also be used in project B.

What should the program manager do first to leverage the utilization of this resource?

  • A . Assign project A's resource to project B
    B. Reassign the resource to project B after protect A ends
    C. Prioritize the resource to optimize their use across both projects A and B
    D. Mitigate risk by leveraging other resources in project A

Show Answer Hide Answer

Suggested Answer: C
 