Share all information about certification and examination!
Forums
Members
Recent Posts
Forums
Dumps Discussion
BICSI
RCDDv14
Notifications
Clear all
RCDDv14
Share and discuss the opinions about the dumps with all RCDDv14 Q&As.
RSS
Page 1 / 6
1
2
3
4
5
6
Next
Topic Title
Views
Posts
Participants
What should the program manager do with the knowledge gained from this activity?
Morgan
, 1 year ago
234
1
No replies
What should the program manager do next?
Rocky
, 1 year ago
231
1
No replies
What should the program manager develop'?
Galen
, 1 year ago
192
1
No replies
What should the program manager do to ensure a successful transition?
Harris
, 1 year ago
218
1
No replies
When responding to a submittal that has been rejected and/or has comments written by a reviewer, the ICT distribution designer may need to perform which two of the following actions? (Select two options.)
Carmelo
, 1 year ago
213
1
No replies
How should the program manager proceed with the component transition?
Harris
, 1 year ago
117
1
No replies
Which two of the following documents MUST be submitted by the communication's project contractor for review and approval? {Select two options.)
Rolando
, 1 year ago
123
1
No replies
An Ethernet passive optical network (EPON) uses an aggregation device called an optical line terminal (OLT). An OLT can support a MINIMUM of______subscribers per port using a passive optical splitter
Vicente
, 1 year ago
111
1
No replies
When sizing an underground entrance facility, what is the MINIMUM amount of 103 metric designator conduits (4 trade size) that should be specified by the ICT distribution design?
Wilber
, 1 year ago
69
1
No replies
What is to be the MINIMUM size of the TR?
Octavio
, 1 year ago
101
1
No replies
In a design type Scope of Work (SoW) the ICT distribution designer is responsible for providing
Giovanni
, 1 year ago
88
1
No replies
In a budding with one join room for serving as the FR and EF and four dedicated TRs on the same floor a total of__________ 103 mm (4 trade size) conduits should be installed to interconnect the backbone pathways to the ER.
Theo
, 1 year ago
62
1
No replies
When responding to a submittal that has been rejected and/or has comments written by a reviewer, the ICT distribution designer may need to perform which two of the following actions? (Select two options.)
Philip
, 1 year ago
70
1
No replies
Which of the following is a common application for exothermic welding of earthing (grounding) and bonding conductors?
Galen
, 1 year ago
73
1
No replies
Which two of the following items MUST be included in a detailed SoW? (Select two options.)
Chi
, 1 year ago
67
1
No replies
What is the RECOMMENDED bend radius of a conduit with an internal diameter of 51 mm (2 in)?
Carrol
, 1 year ago
95
1
No replies
Which service is NOT typical of Grade 1?
Chas
, 1 year ago
91
1
No replies
Which of the following should the program manager do first?
Carrol
, 1 year ago
113
1
No replies
What is the OPTIMAL lime in the construction process for ICT submittals to be reviewed by the ICT distribution designer?
Thurman
, 1 year ago
67
1
No replies
Status information, including program and component status, cost information, risk analysis and other relevant information, is provided in which of the following?
Ernest
, 1 year ago
92
1
No replies
Open RFI's should be reviewed on a _________basis.
Marshall
, 1 year ago
101
1
No replies
Conducted coupling may affect electronic devices primarily through which two of the following means'? (Select two options.)
Orval
, 1 year ago
87
1
No replies
What actions are taken in the process of developing and maintaining a program risk register?
Cletus
, 1 year ago
90
1
No replies
What should the program manager do first?
Marshall
, 1 year ago
125
1
No replies
In a PTP network using optical fiber, the ________ is responsible for media conversions from the optical fiber to the balanced twisted pair network within the residence.
Gonzalo
, 1 year ago
64
1
No replies
A project's closeout plan will be executed by the project manager (PM) and will be managed and approved by the
Morgan
, 1 year ago
64
1
No replies
The MINIMUM required for backbone floor to floor pathways is five (5) sleeves each being 103 mm (four trade size) in diameter What increase in usable floor space should another 103 mm (four trade size) sleeve be added?
Orval
, 1 year ago
84
1
No replies
Which two of the following types of metallic conduit REQUIRE threaded couplings? (Select two options.)
Chas
, 1 year ago
86
1
No replies
Which of the following is a consideration for lighting telecommunication spaces?
Guillermo
, 1 year ago
86
1
No replies
What should the program manager do next?
Chuck
, 1 year ago
90
1
No replies
Page 1 / 6
1
2
3
4
5
6
Next
Share: