Notifications
Clear all

Why ?

1 Posts
1 Users
0 Likes
218 Views
(@hevesywilber)
Noble Member
Joined: 2 years ago
Posts: 682
Topic starter  

A backup job has been configured to keep three incremental restore points and a synthetic full backup each Sunday. More restore points are present on disk than what was configured in the job .

Why ?

  • A . The old restore points will be deleted after the new restore chain meets the retention policy
  • B . Per VM backup files are enabled in the repository
  • C . The other restore points are weekly full backups, this is expected
  • D . You should configure the synthetic full backup to be performed on Mondays instead

Show Answer Hide Answer


   
Quote
Topic Tags

Latest VEEAM VMCE2021 Dumps Valid Version

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Share: