A customer project deploys an 8-node Huawei OceanStor 9000 C Node. The front-end and back-end are all IB networking. The device has been powered on and the interoperability test of all device front-end network ports and customer front-end service sw

1 Posts
1 Users
0 Likes
134 Views
(@ferronigiovanni)
Noble Member
Joined: 2 years ago
Posts: 731
Topic starter  

A customer project deploys an 8-node Huawei OceanStor 9000 C Node. The front-end and back-end are all IB networking. The device has been powered on and the interoperability test of all device front-end network ports and customer front-end service switches has been completed. Next, engineers will install and deploy Huawei OceanStor 900 software, the following are some of the operation methods of engineers in the field deployment process, which one is in line with the operation specification?

  • A . Direct software deployment without disconnecting the front-end network and all storage nodes
  • B . Connect the installation PC directly through the network cable to the OM management network switch to complete the software deployment
  • C . Before the software deployment starts, the engineer configures a temporary back-end IP address on the back-end network port B3-0 (connected to the installation PC) of the 9000 nodes for deploying the DHCP server
  • D . The engineer thinks that the installation PC can be connected to NIC1 to complete the software deployment, so the installation PC is connected to NIC1

Show Answer Hide Answer

Suggested Answer: C

   