Due to the approaching of the National Day, equipment maintenance needs to be powered off and then powered on. What is the correct sequence of power-on?
- A . External power supply -> server power supply -> controller enclosure power supply -> switch power supply
- B . External power supply -> controller enclosure power supply -> switch power supply -> server power supply
- C . External power supply -> server power supply -> switch power supply -> controller enclosure power supply
- D . External power supply -> controller enclosure power supply -> server power supply -> switch power supply
Suggested Answer: B