Notifications
Clear all

Which item should be excluded from the testing scope?

1 Posts
1 Users
0 Likes
92 Views
(@burlandeldridge)
Posts: 713
Noble Member
Topic starter
 

A consultant has been working with a university to build a new student services solution using Salesforce. The consultant is preparing for User Acceptance Testing.

Which item should be excluded from the testing scope?

  • A . User experience in production
    B. Large data volumes
    C. Data load simulation
    D. Average versus peak performance

Show Answer Hide Answer

Suggested Answer: A
 
Posted : 04/02/2023 3:43 am

Latest Salesforce Education Cloud Consultant Dumps Valid Version

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Share: