Which from the below are typical measures of a cumulative flow diagram?

1 Posts
1 Users
0 Likes
173 Views
(@pochethurman)
Posts: 704
Noble Member
Topic starter
 

Which from the below are typical measures of a cumulative flow diagram?

  • A . Lead time
    B. Business value
    C. WIP limits
    D. Throughput

Show Answer Hide Answer

Suggested Answer: A, C, D
 