In Kanban, average ...
 
Notifications
Clear all

In Kanban, average WIP and duration are measured from the point work is pulled from the backlog until it is accepted.

1 Posts
1 Users
0 Likes
115 Views
(@salterslloyd)
Posts: 746
Noble Member
Topic starter
 

In Kanban, average WIP and duration are measured from the point work is pulled from the backlog until it is accepted.

  • A . TRUE
    B. FALSE

Show Answer Hide Answer

Suggested Answer: A
 
Posted : 02/02/2023 2:43 pm

Latest Scrum SAFe-Practitioner Dumps Valid Version

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Share: