In Kanban, average WIP and duration are measured from the point work is pulled from the backlog until it is accepted.
- A . TRUE
B. FALSE
Suggested Answer: A
Posted : 02/02/2023 2:43 pm
In Kanban, average WIP and duration are measured from the point work is pulled from the backlog until it is accepted.