Notifications
Clear all
Topic starter
Click the Exhibit button.
You are preparing to replace a Cisco Nexus 92300YC switch. You have executed the cluster ping-cluster node1 command and received the output as shown in the exhibit.
Which two checks indicate that the cluster is ready for the replacement to be performed? (Choose two.)
- A . 2 paths up, 0 paths down (TCP check)
B. 2 paths up, 0 paths down (UDP check)
C. larger than PMTU communication succeeds on 4 path(s)
D. basic connectivity succeeds on 4 path(s)
Suggested Answer: A,D
Posted : 28/01/2023 2:54 pm