Notifications
Clear all

What should you do to minimize the interruption?

1 Posts
1 Users
0 Likes
105 Views
(@mccroygalen)
Posts: 739
Noble Member
Topic starter
 

The full boot cycle of the CN1610 should take approximately 50 seconds.

What should you do to minimize the interruption?

  • A . Remove all of the cables from the CN1610 CL1 switch, and then connect them to different ports on the CN1610 CL2 switch.
    B. You can migrate the cluster LIFs from the switch that is to be rebooted, and then revert the cluster LIFs after the switch has finished rebooting.
    C. You can migrate Data LIFs to different ports on different nodes.
    D. On each respective switch, use the network interface migrate command to migrate the interswitch
    E. links.

Show Answer Hide Answer

Suggested Answer: C
 
Posted : 27/12/2022 7:42 am

Latest NS0-184 V1 Dumps Valid Version

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Share: