Which two steps sho...
 
Notifications
Clear all

Which two steps should be taken to prepare for this task?

1 Posts
1 Users
0 Likes
78 Views
(@schultzachariah)
Posts: 745
Noble Member
Topic starter
 

An administrator needs to relocate an AHV cluster to a new datacenter during a maintenance window. The cluster will use the same IPs in the new datacenter.

Which two steps should be taken to prepare for this task? (Choose two.)

  • A . Reconfigure IPMI for the new datacenter
    B. Shut down all user VMs in the cluster
    C. Relocate the linked LDAP server
    D. Stop all Nutanix Files clusters

Show Answer Hide Answer

Suggested Answer: C,D
 
Posted : 11/02/2023 9:58 pm
Topic Tags

Latest Nutanix NCP-MCI-5.15 Dumps Valid Version

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Share: