A project requires ...
 
Notifications
Clear all

A project requires the management system to be connected to two third-party generator sets (same model) 1 ATS (same model), six precision air conditioners (same model), and five smart meters (same model), then the management system Need to report ( )

1 Posts
1 Users
0 Likes
133 Views
(@delillovicente)
Posts: 721
Noble Member
Topic starter
 

A project requires the management system to be connected to two third-party generator sets (same model) 1 ATS (same model), six precision air conditioners (same model), and five smart meters (same model), then the management system Need to report ( ) a third-party device access fee? ( )

  • A . 3
    B. 10
    C. 14
    D. None of the above is true

Show Answer Hide Answer

Suggested Answer: D
 
Posted : 16/02/2023 8:36 pm
Topic Tags

Latest Huawei H19-371_V1.0 Dumps Valid Version

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Share: