In the cluster multi-path networking configuration, which of the following are misconfigured?
- A . Virtualization cluster host configuration Install the host multipathing software that comes with the system.
- B . All cluster hosts connecting controllers A and B are assigned to the same Zone of the FC switch
- C . Redundant configuration of physical paths from each cluster host to each controller of the storage.
- D . Allocate all cluster hosts connected to controller A to the same Zone of the FC switch. All cluster hosts connected to controller B are assigned to the same zone of FC switches.
Suggested Answer: D