Notifications
Clear all
Topic starter
Universal Containers (UC) uses two contractors, Contractor 1 and Contractor 2, to perform repair work. Contractor 1 has provided services for UC for a longer period of time and is considered to have more repair work expertise than Contractor 2.
How should the Consultant configure the Contractors' experience?
- A . Assign Contractor 1 and 2 different Skill Levels for repair Work Type.
B. Assign Contractor 1 as a Preferred Resource.
C. Assign Contractor 1 and 2 different capacities for repair work.
D. Assign Contractor 2 as an Excluded Resource.
Suggested Answer: A
Posted : 19/11/2022 1:09 pm