Notifications
Clear all

What two statements should be considered when migrating the flow with change sets?

1 Posts
1 Users
0 Likes
137 Views
(@katterjohnoctavio)
Posts: 721
Noble Member
Topic starter
 

A developer with Universal Containers recently created a flow in the developer sandbox. While working on the flow, the developer deactivated it and made updates multiple times before the flow worked as desired. Now the developer is planning to use a change set to migrate the flow to the QA sandbox.

What two statements should be considered when migrating the flow with change sets? Choose 2 answers

  • A . When a change set with a multiple versioned flow is uploaded, it includes only the active version of the flow.
    B. When a change set with a multiple versioned flow is uploaded, it includes all the versions of the flow.
    C. When a change set with a multiple versioned flow is uploaded, and no active version is available, it includes the most recent inactive version of the flow.
    D. When a change set with a multiple versioned flow is uploaded, and no active version is available, it throws an exception.

Show Answer Hide Answer

Suggested Answer: A,C
 
Posted : 15/02/2023 11:24 am
Share: