Which of the follow...
 
Notifications
Clear all

Which of the following is the PRIMARY reason for an IS audit manager to review the work performed by a senior IS auditor prior to presentation of a report?

1 Posts
1 Users
0 Likes
100 Views
(@schultzachariah)
Posts: 745
Noble Member
Topic starter
 

Which of the following is the PRIMARY reason for an IS audit manager to review the work performed by a senior IS auditor prior to presentation of a report?

  • A . To ensure the conclusions are adequately supported
    B. To ensure adequate sampling methods were used during fieldwork
    C. To ensure the work is properly documented and filed
    D. To ensure the work is conducted according to industry standards

Show Answer Hide Answer

Suggested Answer: A
 
Posted : 30/01/2023 7:07 pm

Latest ISACA CISA Dumps Valid Version

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Share: