Which of the follow...
 
Notifications
Clear all

Which of the following is the BEST detective control for a job scheduling process involving data transmission?

1 Posts
1 Users
0 Likes
90 Views
(@katterjohnoctavio)
Posts: 721
Noble Member
Topic starter
 

Which of the following is the BEST detective control for a job scheduling process involving data transmission?

  • A . Metrics denoting the volume of monthly job failures are reported and reviewed by senior management.
    B. Jobs are scheduled to be completed daily and data is transmitted using a Secure File Transfer Protocol (SFTP).
    C. Jobs are scheduled and a log of this activity is retained for subsequent review.
    D. Job failure alerts are automatically generated and routed to support personnel.

Show Answer Hide Answer

Suggested Answer: D
 
Posted : 10/02/2023 2:14 am

Latest ISACA CISA Dumps Valid Version

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Share: