You want to determine which operations of the routing should be considered in a product cost calculation .
How do you do this? Note: There are 2 correct answers to this question.
- A . By marking the cost indicator in the control key assigned to the operation
B. By marking the Relevance to Costing indicator in the operation
C. By assigning a cost center to the work center in the operation
D. By defining a usage key in the header of the routing.
Suggested Answer: A,B