Which field in the material master record controls whether external requirements should be included in the net requirements calculation during reorder point planning?

1 Posts
1 Users
0 Likes
90 Views
(@sitesmario)
Posts: 734
Noble Member
Topic starter
 

Which field in the material master record controls whether external requirements should be included in the net requirements calculation during reorder point planning?

  • A . MRP type
    B. MRP profile
    C. MRP group
    D. MRP controller

Show Answer Hide Answer

Suggested Answer: C
 