Notifications
Clear all
Topic starter
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?
- A . Model a transportation resorce in the location master.
B. Model a seperate resource in the production data structure.
C. Model a resource inbound in the location master.
D. Model a handling resource in the location master and goods receipt time in the material master.
Suggested Answer: A,D
Posted : 13/02/2023 2:37 am