Notifications
Clear all
Topic starter
Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?
- A . Posting of production costs to the production cost collector
B. Material staging for nex order in sequence
C. Archiving of documents for assembly scrap
D. Posting of goods receipt for the product
E. Reduction of associated capacity requirements
Suggested Answer: A,D,E
Posted : 11/01/2023 1:39 pm