What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?

1 Posts
1 Users
0 Likes
110 Views
(@cainsmarshall)
Posts: 692
Noble Member
Topic starter
 

What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?

  • A . The planed order's component availability is checked.
    B. The planed order is converted to production order.
    C. The planned order's components are copied to the picking list.
    D. The planed order generates capacity requirements

Show Answer Hide Answer

Suggested Answer: D
 