What is the prerequisite for using the free assignment of material?

1 Posts
1 Users
0 Likes
89 Views
(@ozolinsezequiel)
Posts: 701
Noble Member
Topic starter
 

You want to assign components to an equipment task list. There isno BOM assigned to the equipment.

What is the prerequisite for using the free assignment of material?

  • A . Free assignment of material is always possible without any prerequisites.
    B. Assign the header material of a material BOM to the equipmenttask list header.
    C. Assign the header material of a material BOM as assembly to atask list operation.
    D. Assign the BOM usage for free assignment of material in Customizing.

Show Answer Hide Answer

Suggested Answer: D
 