You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way torecord measurement documents.

What do you need to do? Note: There are 2 correct answers to this question.

  • A . Assign a piece of equipment with an allocated measuring point to a task list operation.
    B. Assign an inspection lot to the task list header.
    C. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
    D. Assign an inspection document as PRT to the task list operation.

Show Answer Hide Answer

Suggested Answer: A,C
 
Posted : 27/12/2022 11:13 am