Notifications
Clear all
Topic starter
What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing
- A . Settings for the inspection type activated in the material level
B. Usage of the class characteristics in the task list
C. Configuration settings
D. Master inspection characteristic linked to class characteristics
Suggested Answer: D
Posted : 11/02/2023 3:38 pm