What is required in...
 
Notifications
Clear all

What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing

1 Posts
1 Users
0 Likes
86 Views
(@ferronigiovanni)
Posts: 731
Noble Member
Topic starter
 

What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing

  • A . Settings for the inspection type activated in the material level
    B. Usage of the class characteristics in the task list
    C. Configuration settings
    D. Master inspection characteristic linked to class characteristics

Show Answer Hide Answer

Suggested Answer: D
 
Posted : 11/02/2023 3:38 pm

Latest SAP C_TPLM40_65 Dumps Valid Version

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Share: