Which solution would apply to this scenario? Note:

1 Posts
1 Users
0 Likes
85 Views
(@soquirandolph)
Posts: 729
Noble Member
Topic starter
 

While modeling for a large machine with high capital needs, you need it to run cost effectively with minimum utilization, even if it means producing more than demand.

Which solution would apply to this scenario? Note: There are 2 correct Answers to this question.

  • A . Capacity leveling will be possible for production and storage resources.
    B. Excess stock can be generated and will need to be staged in an overflow warehouse.
    C. Enough demands can be pulled forward and pull production will occur.
    D. Balance can be achieved between excessive prebuild and minimum utilization by incorporating violation costs.

Show Answer Hide Answer

Suggested Answer: C, D
 