Which of the follow...
 
Notifications
Clear all

Which of the following can you only perform in Advanced Scheduling? Note: There are 2 correct Answer to this question.

1 Posts
1 Users
0 Likes
66 Views
(@boehnkearden)
Posts: 697
Noble Member
Topic starter
 

Which of the following can you only perform in Advanced Scheduling? Note: There are 2 correct Answer to this question.

  • A . You can select a time zone for scheduling.
    B. You can schedule emails to be sent in the future.
    C. You can schedule test launches one after another.
    D. You can schedule versions for A/B testing.

Show Answer Hide Answer

Suggested Answer: B,C
 
Posted : 02/12/2022 12:41 am

Latest SAP C_C4H225_11 Dumps Valid Version

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Share: