When preparing an upfront cost estimate, the ICT distribution designer MUST consider which two of the following fees? (Select two options.)

1 Posts
1 Users
0 Likes
187 Views
(@leneaveorval)
Posts: 705
Noble Member
Topic starter
 

When preparing an upfront cost estimate, the ICT distribution designer MUST consider which two of the following fees? (Select two options.)

  • A . Taxes
    B. Permits
    C. Inspection
    D. Licensing
    E. Safety

Show Answer Hide Answer

Suggested Answer: B, C
 