Share all information about certification and examination!
Forums
Members
Recent Posts
Forums
Dumps Discussion
BICSI
RCDDv14
Notifications
Clear all
RCDDv14
Share and discuss the opinions about the dumps with all RCDDv14 Q&As.
RSS
Page 2 / 6
Prev
1
2
3
4
5
6
Next
Topic Title
Views
Posts
Participants
What is the MINIMUM lighting requirement (or telecommunications spaces?
Philip
, 1 year ago
59
1
No replies
What is your MOST appropriate next step?
Guillermo
, 1 year ago
87
1
No replies
What should the program manager do?
Chas
, 1 year ago
66
1
No replies
When designing cable tray pathways under an access floor, what is the MINIMUM free space that should exist between the top of the cable tray side rails and the underside of the stringers?
Antwan
, 1 year ago
56
1
No replies
In which phase of the protect design would an ICT distribution designer be expected to prepare preliminary cost estimates?
Lloyd
, 1 year ago
65
1
No replies
What is this process called?
Randolph
, 1 year ago
74
1
No replies
For a cost estimate, an ICT distribution designer should produce a document listing each task with a cost placed beside them. The type of document used is a
Rueben
, 1 year ago
79
1
No replies
An ICT distribution designer is preparing a price quote for a building design with multiple floors originally sized at 40.000 ft (3716 m2). While the designer is preparing the quote, the structural engineer indicates the building has been increased i
Theo
, 1 year ago
50
1
No replies
Which two of the following may the ICT distribution designer need to provide in order to identify the BEST solutions for the client's need? (Select two options.)
Carrol
, 1 year ago
53
1
No replies
Which of the following would the customer be interested in reviewing?
Rayford
, 1 year ago
67
1
No replies
To prevent this concern in the future, which of the following should occur?
Gonzalo
, 1 year ago
100
1
No replies
After further analysis of the performance indicators the program manager should do which of the following*?
Marshall
, 1 year ago
58
1
No replies
Which two of the following are REQUIRED for the UL standard?
Marshall
, 1 year ago
65
1
No replies
The program manager should ensure that the results obtained by this opportunity are working in tandem with which of the following?
Chuck
, 1 year ago
86
1
No replies
During a program's definition phase, it is determined that the best approach for delivering the programs intended benefits is to supplement corporate resources with the procurement of specific products and services from external suppliers. The progra
Manual
, 1 year ago
59
1
No replies
What method addresses the mitigation or suppression of unwanted signals?
Zachariah
, 1 year ago
56
1
No replies
Who prepares the submittals that are reviewed and approved to ensure that the clients design criteria is met in regards to material selection?
Octavio
, 1 year ago
66
1
No replies
Communicating a project's design and technical specifications to the client and stakeholders is part of the ___________of the project.
Ali
, 1 year ago
54
1
No replies
In preparation for the development and submission of the program master schedule to a client, the program manager meets with (he component project manager and master program scheduler to discuss the work breakdown structure (WBS) During the meeting,
Wilber
, 1 year ago
57
1
No replies
To accommodate telephone, data, CATV, security and multimedia, a MINIMUM of ________ strands of optical fiber auxiliary disconnect outlet (ADO) cable should be provided.
Philip
, 1 year ago
55
1
No replies
What should the program manager verity prior to allowing the component to close?
Carrol
, 1 year ago
94
1
No replies
Close out documentation is initially discussed in which of the following meetings?
Wilber
, 1 year ago
83
1
No replies
Which stakeholder of a project team is responsible to provide closeout documentation to the client? Architect
Mauro
, 1 year ago
63
1
No replies
When responding to a submittal that has been rejected and/or has comments written by a reviewer, the ICT distribution designer may need to perform which two of the following actions? (Select two options.)
Ezequiel
, 1 year ago
74
1
No replies
What should the program manager do next?
Chuck
, 1 year ago
70
1
No replies
What should the program manager do next?
Zachariah
, 1 year ago
106
1
No replies
Identify the core switch(es) and server(s) of the data center in the diagram below by dragging the appropriate term into each box in the diagram
Orval
, 1 year ago
73
1
No replies
Which of the following information about the site shall be included?
Philip
, 1 year ago
76
1
No replies
What is the MINIMUM fire rating for telecommunications spaces walls and wall linings, if not specified otherwise by local Authority Having Jurisdiction (AHJ)?
Coy
, 1 year ago
82
1
No replies
Which will provide the greatest value to clarify stakeholder perceptions?
Jacques
, 1 year ago
95
1
No replies
Page 2 / 6
Prev
1
2
3
4
5
6
Next
Share: