Which visualization...
 
Notifications
Clear all

Which visualization should the business analyst use to meet these requirements?

1 Posts
1 Users
0 Likes
170 Views
(@pochethurman)
Noble Member
Joined: 2 years ago
Posts: 704
Topic starter  

To improve efficiencies a hospital mustanalyze how often a surgery is started late by operating room and surgeon.

The business analyst must consider several factors

• Dates of each surgery

• Number of minutes the start of the surgery is delayed

• Operating room

• Surgeon name

Which visualization should the business analyst use to meet these requirements?

  • A . A combo chart that shows total minutes of delayed starts by operating room and surgeon
  • B . A bar chart with total minutes of delayed starts and a drill-down from operating room to surgeon
  • C . A scatter plot with delayed start minutes per day operating room and surgeon
  • D . A line chart with total minutes of delayed starts and a drill-down from operating room to surgeon

Show Answer Hide Answer

Suggested Answer: D

   
Quote

Latest QlikView QSBA2021 Dumps Valid Version

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Share: