Notifications
Clear all
Topic starter
Click the Exhibit button.
You want to add an AFF A400 system to an existing 4-node cluster.
Referring to the exhibit, which number points to the ports that are used to cable the new nodes to the cluster interconnect switches.
- A . 1
B. 2
C. 3
D. 4
Suggested Answer: B
Explanation:
Reference: https://docs.netapp.com/us-en/ontap-systems/a400/install-detailed-guide.html#option-1-cable-the-controllers-to-a-single-drive-shelf
Explanation:
Reference: https://docs.netapp.com/us-en/ontap-systems/a400/install-detailed-guide.html#option-1-cable-the-controllers-to-a-single-drive-shelf
Posted : 17/02/2023 3:35 am