The operation process for putting the equipment on the shelf is to prepare the tools first, then install the mounting ears, install the floating nuts and slides according to the site conditions, and finally install the equipment to the cabinet.

1 Posts
1 Users
0 Likes
145 Views
(@whellerrashad)
Posts: 729
Noble Member
Topic starter
 

The operation process for putting the equipment on the shelf is to prepare the tools first, then install the mounting ears, install the floating nuts and slides according to the site conditions, and finally install the equipment to the cabinet.

  • A . True
    B. False

Show Answer Hide Answer

Suggested Answer: A
 
Posted : 18/11/2022 9:12 pm