Notifications
Clear all
Topic starter
Which of the following methods will BEST reduce the risk associated with the transition to a new system using
technologies that are not compatible with the old system?
- A . Parallel changeover
B. Modular changeover
C. Phased operation
D. Pilot operation
Suggested Answer: A
Posted : 17/11/2022 8:24 pm