A security consultant needs to protect a network of electrical relays that are used for monitoring and controlling the energy used in a manufacturing facility.
Which of the following systems should the consultant review before making a recommendation?
- A . CAN
- B . ASIC
- C . FPGA
- D . SCADA
Suggested Answer: D