Notifications
Clear all
Topic starter
What are some uses for the low-level code assigned to each material?
- A . It is used in MRP to determine the sequence in which materials are planned.
B. It is used by product costing to determine how coast are rolled up.
C. It is used by engineering to indentify subitems in an engineering bill of material (BOM).
D. it is used by ATP to determine the priority of alternative components.
Suggested Answer: A,B
Posted : 09/01/2023 7:48 am