Notifications
Clear all
Topic starter
What enables the direct warehouse task creation in the SAP Best Practice Warehouse Kanban Supply into Production (3VT)?
- A . The production supply area assigned to the work center
B. The special procurement key in the material master
C. The issuing storage location in the production version
D. The replenishment strategy in the control cycle
Suggested Answer: D
Posted : 16/01/2023 9:52 am